Monthly Archives: October 2024

How were we in 2023

Tetra Consulting worked closely with Local Council’s, TMR and Developers to achieve their engineering objectives in 2023. Below are some of the projects Tetra Consulting delivered during the year of 2023:

– Pioneer River Levee
– Pioneer River Shared Path
– Gorge Road Upgrade
– Shakespeare Street Watermain
– Griffin Street Watermain
– 23 Symons Street Development
– Sarina Hospital
– Pugsley Street Subdivision
– Southlink Industrial Estate – Stage 1
– Mackay Airport – Long Term Carpark Extension
– Numerous Asset Design As Constructed (ADAC) & As Constructed Projects

Tetra Consulting would like to thank our clients for their ongoing support.

2022 in Review

2022 kept the team at Tetra Consulting hard at it, working with Local Council’s, TMR and Developers. Below is a snapshot of some of the projects Tetra Consulting delivered during the year of 2022:

– Warland Street Drainage
– Gorge Road Upgrade
– Willetts Road Shared Path – Gooseponds Creek Crossing
– Fursden Street Watermain
– Belmunda Road Culvert Reconstruction
– Brisbane Street Watermain Renewal
– Webberley Street Shared Path
– Shinn Street Watermain Renewal
– Hamilton Street Watermain Renewal
– Ooralea Waters – Stage 5
– Canelands Carpark South Eastern Entrance – Concept Design
– Pioneer Lakes – Stage 6A/1 Construction Supervision
– Northern Beaches Emporium Construction Supervision
– Numerous Asset Design As Constructed (ADAC) & As Constructed Projects

Tetra Consulting would like to thank our clients for their ongoing support.