2022 in Review

2022 kept the team at Tetra Consulting hard at it, working with Local Council’s, TMR and Developers. Below is a snapshot of some of the projects Tetra Consulting delivered during the year of 2022:

– Warland Street Drainage
– Gorge Road Upgrade
– Willetts Road Shared Path – Gooseponds Creek Crossing
– Fursden Street Watermain
– Belmunda Road Culvert Reconstruction
– Brisbane Street Watermain Renewal
– Webberley Street Shared Path
– Shinn Street Watermain Renewal
– Hamilton Street Watermain Renewal
– Ooralea Waters – Stage 5
– Canelands Carpark South Eastern Entrance – Concept Design
– Pioneer Lakes – Stage 6A/1 Construction Supervision
– Northern Beaches Emporium Construction Supervision
– Numerous Asset Design As Constructed (ADAC) & As Constructed Projects

Tetra Consulting would like to thank our clients for their ongoing support.